Argentine Animal Health Leader CDV Begins Production at US$100 Million Pilar Vaccine Plant, Quadrupling Annual Capacity to 450 Million Doses
Argentine veterinary biopharmaceutical manufacturer Centro de Diagnóstico Veterinario (CDV) has officially commenced commercial production at its third veterinary vaccine manufacturing facility following a landmark US$100 million capital investment. Located in the Pilar Industrial Park in Buenos Aires Province, the new 14,650-square-metre plant—constructed on a 30,450-square-metre site—is projected to quadruple CDV’s total manufacturing output to 450 million vaccine doses annually.
CDV’s Manufacturing FootPrints
With four decades of specialization in veterinary diagnostics and biologicals, CDV designed Plant 3 to serve both domestic Argentine livestock producers and rapidly expanding export markets across Latin America, Asia, the Middle East, and Africa. Initial production runs at the new facility focus primarily on inactivated viral and bacterial vaccines for beef and dairy cattle as well as sheep, targeting high-impact reproductive, respiratory, clostridial, and zoonotic diseases.
In a planned second operational phase, the automated lines are engineered to scale into vaccines for swine and companion animals, broadening CDV’s multi-species biomanufacturing footprint.
Plant 3 integrates seamlessly alongside CDV’s two existing Pilar facilities: Plant 1, which produces live and high-biocontainment biologicals including Brucella (15 million doses), PPD tuberculin (15 million doses), rabies (25 million doses), poultry, and aquaculture vaccines; and Plant 2, inaugurated in 2018 as a dedicated high-containment facility producing over 60–80 million doses annually of Foot-and-Mouth Disease (FMD / aftosa) vaccines.
Manufacturing Facility Details
Engineered under World Class Manufacturing (WCM) principles and compliant with international Good Manufacturing Practices (GMP) and Pharmaceutical Inspection Co-operation Scheme (PIC/S) standards, the facility incorporates closed-system bioprocessing, automated formulation and filling lines, and stringent biosafety controls. To align industrial expansion with environmental sustainability, CDV also operates under a long-term renewable energy supply agreement with Genneia covering approximately 80% of electricity demand across its three Pilar manufacturing plants.
Benefits of Capacity Expansion
The capacity expansion directly underpins CDV’s aggressive international regulatory roadmap. Currently exporting veterinary biologicals to more than 30 countries, CDV is actively advancing dossier registrations and regulatory inspections across 40 additional international markets—positioning the company to supply more than 70 countries in the near term.
Ahead of full-scale output, CDV completed major external quality audits—including GMP recertifications for Plants 1 and 2 and an international audit by Brazilian authorities reviewing over 350 quality documents—with 17 additional foreign regulatory audits scheduled to unlock new export authorizations.
Facility & Strategic Parameter |
Operational & Financial Data |
Company & Location |
CDV (Centro de Diagnóstico Veterinario) — Pilar Industrial Park, Buenos Aires, Argentina |
Capital Investment |
US$100 million (four-year strategic expansion program) |
Facility Footprint |
14,650 sq. m built area on a 30,450 sq. m industrial plot (Plant 3) |
Total Production Capacity |
Quadruples company capacity to 450 million vaccine doses/year |
Primary Species & Disease Targets |
Phase 1: Cattle & sheep (reproductive, respiratory, clostridial, zoonotic); Phase 2: Swine & pets |
Quality Standards & Export Reach |
GMP, PIC/S, WCM & SENASA certified; exports to 30+ countries, expanding into 40+ new markets (70+ total) |



